Contact Us

E-mail:
export@syhuali.com

WhatsApp:
+86-15142051054

Tel:
+86-24-85818396

Address:
10A-2, 5th Road, Tiexi District, Shenyang, China

Wind & Solar Switch

全部
  • 全部
  • 产品管理
  • 新闻资讯
  • 介绍内容
  • 企业网点
  • 常见问题
  • 企业视频
  • 企业图册

ZHN3A-72.5 Green GIS for Wind & Solar Energy

Huade Electric has researched and developed ZHN3A-72.5 Green GIS specially used for new energy. This new fluorine-free environment-friendly 72.5kV gas-insulated metal-enclosed switch adopts the world's leading new science and technology and production process. It has high reliability and maintenance-free high-tech fluorine-free environment-friendly switch equipment with high technical parameters (rated current is 1250A, up to 2500A); rated short-circuit breaking current 31.5kA, up to 40kA) and small floor area (length of 2500mm, width of 980mm).

View More +

YB□-12/0.4 State Grid Standardized Customized Box-type Substation

The standardized customized box type substation meets the design principles of "safety, reliability, durability, unified standards, universal interchangeability, reasonable classification and wide use". High voltage cabinet adopts standardized customized SF6 gas insulated RMU or environment-friendly gas insulated RMU. The transformer is energy-saving and environment-friendly, fully sealed, oil immersed transformer (silicon steel sheet/amorphous alloy). The internal space of the box type substation is equipped with an automatic terminal and an independent secondary cabinet.

View More +

YB□ - 40.5/0.69 Wind Power Combined Substation

The wind power generation combined substation product is a new type of step-up equipment developed for the particularity of wind power generation. It is a special power equipment integrating step-up transformer, high-voltage circuit breaker (or high-voltage load switch, fuse), low-voltage switch cabinet and corresponding auxiliary equipment. The products are small in size, light in weight, easy to install, low noise, low loss, wind and sand proof, anti-theft, strong overload capacity, simple maintenance, and fully meet the operational requirements of the wind farm.

View More +

< 1 >